The process

How a kitchen goes from a tape measure to a finished room

Seven stages, in the same order, every time — with a fixed written quote before a single board is cut.

8–10 weeks typical Fixed written quote 2-year guarantee

Start to finish

The same seven steps,
every single time

A bespoke kitchen is a big spend and a disruptive one. The antidote is knowing exactly what happens next and roughly when. Nothing below is a sales stage — every step produces something you can see.

STEP 01

The first visit

Ollie comes to you — kitchen, coffee, tape measure. You talk about how you actually cook, where the light falls, what drives you mad about the room now. No showroom, no sales script, no three-hour presentation.

Good to knowTakes about 90 minutes. Free, anywhere in West Sussex or London.
STEP 02

Measure & survey

Every wall measured, floors checked for level, services traced. Old houses are never square and pretending otherwise is how kitchens end up with 20mm scribe fillers everywhere.

Good to knowLaser and tape, both. Recorded on a hand-drawn rod.
STEP 03

Drawing & fixed quote

You get a plan, elevations and a written quote itemised by cabinet — not a single number on a page. If something is out of budget, we say so and show you the alternative.

Good to knowUsually within a week of the visit.
STEP 04

Choosing the details

Doors, paint colours, worktops, handles, hinges, sinks, taps. Ollie brings samples to you and will happily talk you out of an expensive idea that will not work.

Good to knowFarrow & Ball, Little Greene, or matched to anything.
STEP 05

Making

Now the bench work. Carcasses cut and biscuit-jointed, frames machined from tulipwood or oak, drawer boxes dovetailed, doors assembled and sanded through the grits.

Good to knowThree to six weeks depending on size.
STEP 06

Fitting

Delivered and installed by the person who built it. Scribed to your walls, doors hung and adjusted, drawers set to an even gap. Dust sheets down, and the site swept every evening.

Good to knowOne to two weeks on site, typically.
STEP 07

Hand painting & handover

Painted in place after fitting, so there are no chipped edges from transit and no visible break between cabinet and wall. Interiors sealed. Then a walk round together, snags fixed, and a two-year guarantee.

Good to knowTwo-year guarantee. Insured to £1m throughout.

Timeline

Eight to ten weeks, typically

Most kitchens run to a similar rhythm. Yours will be given real dates before anything is ordered, and Ollie only ever has one kitchen on the bench at a time.

Week 0
Design visit and survey at your home
Week 1
Drawings and itemised fixed quote sent over
Week 2–3
Details chosen: doors, colours, worktops, hardware
Week 3–8
Making — carcasses, frames, doors, dovetailed drawers
Week 8–9
Strip out and fit; trades coordinated around it
Week 9–10
Hand painting on site, sealing, snagging, handover
Then
Two-year guarantee; Ollie is a phone call away

What you get

Three things arrive before you spend anything

Deliverable 01

A measured plan

A scaled floor plan of the room as it actually is — not as the estate agent drew it — with the proposed layout over the top, showing every cabinet, appliance and service run.

Deliverable 02

Elevations

Each wall drawn front-on, so you can see door proportions, drawer heights, cornice and where the eye is going to land when you walk in.

Deliverable 03

An itemised quote

Priced cabinet by cabinet, with painting, fitting and hardware separated out. If you want to lose the pantry to save money, you can see precisely what that saves.

Good to know

Process questions

Typically four to eight weeks from accepting a quote to work starting, depending on the time of year. Autumn and the run-up to Christmas are the busiest. If you have a fixed deadline — a birth, a wedding, a house sale — say so at the first visit and it will be planned around.

No. Your existing kitchen stays in use while yours is being made, which is most of the timeline. You are only without a working kitchen during the fit itself — usually one to two weeks. Ollie will normally leave the sink and one appliance connected as long as possible, and will tell you at the survey exactly which days will be difficult.

Ollie does all the carpentry and fitting himself and coordinates the trades around it — plumber, electrician, tiler and worktop templater. He works with the same people regularly across Sussex and London, so the sequencing is already understood. If you have your own trades you would rather use, that is fine too.

Old houses hide things: rotten sole plates, a chimney breast that is not where the plans say, forty years of overpainted pipework. If something structural turns up, work stops, you get a photograph and an explanation, and you decide what happens next before another hour is spent. Nothing is added to an invoice without you agreeing to it first.

Yes. The written quote is itemised and fixed for the work described in it. The only things that move the number are changes you ask for, or genuine hidden problems discussed and agreed with you at the time.